Installing our high quality floor mats is one of the best upgrades for your workspace, gym, or hobby area. With the right method, you’ll have a clean, safe, durable surface in no time. Follow these steps below to make the process smooth and efficient.
Step 1 Measure & Prepare the Floor
Start by measuring the full floor area where the interlocking tiles will go.
Clean the surface thoroughly: remove dirt, oil stains, debris, and any loose material.
If the concrete or base floor is uneven (for example dips or cracks), consider repair or levelling to avoid mat edges lifting. As with interlocking tile systems: “can be laid on even slightly uneven surfaces” with proper prep.
Let the floor dry completely before proceeding.
Step 2 Start laying the tiles
Start laying each tile from the centre of the room or space.
Align the pieces so they cover the space properly, trimming edges if needed for walls, posts or fixtures.
Ensure the seams or joints align neatly and look even this helps final installation look professional.
Use our ramp and corner attachments where required.
Step 3 Quality Assurance
Walk across the mat surface and feel for any uneven spots, raised seams or gaps. Correct these before regular use.
Sweep or vacuum the surface to remove any installation debris.
If required, use a damp cloth or hose to clean the mat, then allow it to dry.
With the mat properly installed, your garage floor is now ready for daily use: parking your car, working on projects, storing equipment, or even training. The new surface will provide protection, better aesthetics, and improved durability.